Roof inspections, repair and replacement across north Mecklenburg and Lake Norman(704) 555-0172
Drip Edge Roofing Co.
ServicesStorm damageHow pricing worksAbout TomService areaFAQ(704) 555-0172
Blue craftsman house with a new architectural shingle roof, photographed from the street

Huntersville, NC · since 2011

Roof replacement and repair in Huntersville, NC

Tom Kessler walks your roof, photographs twelve things, and writes a line-item proposal from what he finds. Replacement, repair, storm and hail work across north Mecklenburg and the Lake Norman towns.

No. 14 · Birkdale, Huntersville · Replacement · one day · dried in by 4:10 · Sample photo

NC General ContractorLicense number in the footer of every page. Shown at launch.
Since 2011Residential roofing across north Mecklenburg and Lake Norman.
InsuredGeneral liability and workers' comp. Certificate on request.
Tom Kessler, owner of Drip Edge Roofing Co., with a roofing nailer under the trees at a Cornelius house
Tom Kessler, owner. Rear slope, Cornelius. Sample photo.

Who walks your roof.

Drip Edge Roofing Co. is a small residential roofing company in Huntersville. Tom Kessler, the owner, walks each roof before a proposal is written, and the same crew does the tear-off, the flashing and the clean-up.

Most of the work is on subdivision houses built between the 1990s and the 2010s, now reaching the end of their first shingle roof, plus the repairs and storm claims in between.

The twelve things we photograph before we quote.

This is the walk, in order: one photograph per item, a status on every line and a note in plain English. The statuses below are from a sample report on a 2003 house in Cornelius.

Sample report2003 two-story · Cornelius, NC · walked by Tom Kessler
  1. Ridge cap and ridge vent
    01Ridge cap and ridge ventGood

    Cap is original and seated, no lifted tabs. Ridge vent is continuous but doing nothing without intake below it.

  2. Field shingles: granules and nail pops
    02Field shingles: granules and nail popsFix now

    Bare spots on the south slope, granules turning up in the gutter trough, fourteen nail pops, two with the head through the mat.

  3. Pipe boots, skylights and penetrations
    03Pipe boots, skylights and penetrationsFix now

    Both rubber collars split at the pipe. This is the leak over the hall bath. Skylight curb is intact. An abandoned dish mount is lag-bolted through the field, unsealed.

  4. Step flashing at walls and dormers
    04Step flashing at walls and dormersWatch

    Reused at the dormer sidewall. Sealed, not woven. It will be a leak.

  5. Chimney: counter flashing and cricket
    05Chimney: counter flashing and cricketFix now

    Counter flashing is let into the mortar and still tight. There is no cricket, and debris and water are sitting on the uphill side.

  6. Valleys
    06ValleysGood

    Closed-cut, clean, no exposed nails in the valley center.

  7. Drip edge, eaves and rakes
    07Drip edge, eaves and rakesFix now

    Missing on the rear eave, so water runs behind the gutter. Short at the left rake, fascia stained underneath.

  8. Starter strip and underlayment
    08Starter strip and underlaymentWatch

    Cut three-tab used as starter, common for this build era. Ice and water membrane visible at the eave where a shingle lifted.

  9. Decking, sounded underfoot
    09Decking, sounded underfootWatch

    Two soft sheets near the rear valley. Flagged for the proposal as a per-sheet line, not a lump sum.

  10. Attic: intake, exhaust and sheathing
    10Attic: intake, exhaust and sheathingFix now

    Soffit vents painted shut along the front elevation. No intake at all. Dark staining on the north sheathing, dry to the touch.

  11. Gutters and downspouts
    11Gutters and downspoutsWatch

    Seamless aluminum, sound, pitched away from the left downspout. Right downspout dumps against the foundation with no extension.

  12. Fascia and soffit
    12Fascia and soffitFix now

    Rot in the rear fascia behind the missing drip edge. Soft for about six feet.

Book the inspection→

Sample report. Good means it has life left, Watch means photograph it again next year, Fix now means water is already getting past it.

Roofing crew tearing off an old roof on a brick two-story, ladders up and the beds covered
Tear-off day on a brick two-story. Sample photo.

Three roofs, and what was actually under them.

Two-story suburban house with a new steep shingle roof at dusk
After. Cricket built, dried in by four.

1998 two-story off Jetton Rd

Cornelius, west of Highway 115
Roofer kneeling on a damaged section of shingle roof
Before. The closet stain traced to the chimney.
Roofers laying underlayment and shingles on a steep roof
During. Underlayment down by noon.
Pitch8/12 main, 4/12 porch
Squares38
Days2
MaterialArchitectural asphalt, weathered wood

The homeowner called about a ceiling stain in an upstairs closet, which turned out to be twelve years of water sitting behind a chimney that was too wide to go without a cricket. We built one, replaced the six sheets that had gone soft under the rear valley, and photographed all of it before the new underlayment went down. Sample project.

Craftsman style house with dormers and a new shingle roof
After. Four-color HOA list, charcoal chosen.

2005 dormered house in Harrisburg

Harrisburg, near Rocky River Rd
Roofer carrying his gear up the driveway on the first morning
Before. Two layers, one disclosed.
Roofer at the eave checking the edge of the shingles
During. The deck was clean. Rare.
Pitch10/12, three dormers
Squares27
Days2
MaterialArchitectural asphalt, charcoal

The proposal was written for a single layer because that is what the eave edge showed. When the second layer turned up we stopped, photographed it, and wrote the change before touching another square rather than presenting it at the end. The HOA submittal took a week. Sample project.

Brick two-story with a new roof, seen from the street
After. Off the roof at 4:40.

2001 brick infill in old-town Davidson

Davidson, two blocks off Main St
Two roofers at a brick chimney checking the counter flashing
Before. Counter flashing pulled from the mortar.
Close-up of new shingle courses
During. New step flashing, woven not caulked.
Pitch6/12, two gables
Squares31
Days1
MaterialArchitectural asphalt, pewter gray

A 2001 infill house on the original builder roof. Tear-off found reused step flashing at the garage wall and a chimney with no cricket, both photographed before the underlayment went down. One layer, decking sound, one day. Sample project.

Roofer climbing a ladder to a garage roof in the late afternoon
Sample photo.
On the day

How a replacement day runs.

Most replacements on houses up here take one or two days. This is the order the crew works in, whatever the roof.

  1. Set upTarps over the beds, a dumpster at the driveway, plywood against the siding under the eaves.
  2. Tear-offShingles and underlayment come off to the deck, one slope at a time, so the house is never open all at once.
  3. Deck checkEvery sheet is walked and sounded. Soft decking is replaced and listed as its own line on the invoice.
  4. Underlayment and flashingDrip edge, ice and water membrane at the eaves and valleys, synthetic underlayment, new step and counter flashing.
  5. Shingles and ridgeStarter strip, field shingles, ridge vent and cap.
  6. Clean-up and walkNails swept from the lawn and driveway, gutters cleared, and a walk around the house with you before the crew leaves.

The workmanship warranty is written on your proposal with its term, alongside the manufacturer's warranty on the shingle line you choose.

What moves the number, and how you pay it.

No figure goes on a website, and we don't run a calculator, because both are a guess until somebody has stood on the deck. After the walk you get a line-item proposal in writing. The lines that move it: squares, pitch, how many layers come off, sheets of decking replaced, flashing and chimney work, the shingle line you choose, the permit, and disposal.

If you'd rather pay it over time, ask Tom on the walk. Where financing is offered the terms are written on the proposal beside the line items, so you compare the same two numbers we do. Nothing about it changes the price of the roof.

How pricing works

What people say after the roof is on.
Roofer standing on a shingle roof with a rope, tied in
The pipe boot that was not a new roof. Cornelius. Sample photo.

“He found the leak in twenty minutes and it was a split pipe boot, not the new roof the last two companies told me I needed. He fixed it that afternoon and told me the roof had six or seven years left. I called him back four years later for the replacement, which I suppose was the point. Sample review.”

Homeowner, Cornelius

“Tom walked the whole roof before he wrote anything down, and the proposal spelled out exactly what the tear-off and decking work would cost.”

Homeowner, Huntersville · roof replacement · Sample

“Went through a hail claim with them and Tom met the adjuster on the roof himself. The supplement they filed caught flashing damage the first scope missed.”

Homeowner, Davidson · storm and hail · Sample

“Gutters were pulling away from the fascia and they traced it back to missing drip edge from the original build.”

Homeowner, Concord · gutters · Sample

Reviews on this sample site are placeholders. A live site shows the real Google count here and links straight to the profile. More sample reviews

Where the crew works.

The shop is on S. Old Statesville Rd in Huntersville, and the crew works Huntersville, Cornelius, Davidson, Mooresville, Concord, Harrisburg. Most jobs are ten to thirty minutes from the shop.

Outside those towns, call anyway and we will tell you honestly whether the drive makes sense. Every town, with what the roofs there tend to need.

Aerial view of a north Mecklenburg subdivision with shingle roofs
North of the city, on purpose.

Five questions Tom answers on every roof.

How much does a new roof cost?

We don't publish a figure, because a roof price written before anybody climbs up is either a guess or bait. After the walk you get a line-item proposal: squares, pitch, tear-off layers, decking replacement, flashing and chimney work, the shingle line you picked, permit and disposal. Every line is a real quantity you can check. The how pricing works page goes through each driver.

Do I need a whole new roof or just a repair?

It depends on whether the field of the roof is finished or one detail failed. Granules filling the gutters, curled tabs across whole slopes and nail pops everywhere mean the shingles are at the end of their life. A stain in one ceiling usually means a pipe boot, a valley or step flashing, and that is a repair. Tom will tell you which, in writing, including when the answer costs us the bigger job.

Will you handle my insurance claim?

We document the damage with dated photographs and a measured diagram, help you file, and we can be on the roof when the adjuster walks it, so the scope is written off the same evidence. If the scope misses something we file a supplement with documentation attached. What we will not do is offer to waive, absorb or rebate your deductible, because that is illegal in North Carolina. See storm damage.

How long does a replacement take?

Most subdivision roofs up here are one day, sometimes two if the pitch is steep, there are several dormers, or a second layer turns up. Either way the deck is covered with underlayment before the crew leaves each day.

Do you work with my HOA's approved color list?

Yes, and most neighborhoods up here have one. We pull the sample boards for the approved colors, photograph the street so you can see what the neighbors actually did, and prepare whatever the architectural committee wants to see. Budget about a week for the submittal. It is easier to do this before the shingles are ordered than after.

Tell us what the roof is doing.

(704) 555-0172

Monday to Friday 7am to 6pm. Saturday 8am to 2pm. Active leaks answered after hours.

What's going on?
Roughly how old is the roof?

A person calls you back. Name and phone are all we need; everything else helps us bring the right ladder.

Call (704) 555-0172Book