
Siding Replacement in Charlotte, NC
Full tear-off, never a layover. Fiber cement, engineered wood, vinyl, and cedar repair on the older houses where matching an existing profile matters more than a brochure.
What we actually do
We strip the elevation down to sheathing, fix what is wrong underneath, and rebuild the whole wall as one system — house wrap, flashing, trim, siding. Siding installed over failing board hides the problem for about four years and then costs you twice.
- James Hardie ColorPlus and LP SmartSide, factory-finished
- Insulated and standard vinyl where the budget or the HOA calls for it
- Cedar repair and milled matches on pre-1960 houses
- Board-and-batten, shake gables, and column and soffit wrap
- Rotten sheathing and framing repaired at the per-sheet rate printed in your contract
How a Charlotte siding job actually goes
Most of the houses we side were built between 1955 and 1995, and the two things that decide the job are what the original builder used for sheathing and how the water has been running off the roof for thirty years. We tell you which one you have at the walkaround.
- Day 1 — dumpster set, landscaping covered, first elevation stripped
- Day 1–2 — sheathing inspected and repaired, photos sent to you the same afternoon
- Day 2–3 — house wrap and flashing, windows and doors re-detailed
- Day 3–7 — siding and trim installed, elevation by elevation
- Final day — caulk, touch-up, magnet sweep, walkthrough with your project manager

The Bellhaven Standard
Four promises. Each one names what we do if we miss it, because a guarantee that does not name a consequence is just a sentence on a website.
We start on the date in your contract
Not the week. The date. Material is on site before the crew is.
If we start late for any reason other than weather or a permit hold: money off the final invoice, applied automatically.Your property is clean every evening
Debris hauled, beds raked, driveway and lawn magnet-swept before the truck leaves — not just at the end of the job.
Find a nail in your driveway after we have left for the day and we will pay for the tire.One project manager, named on the contract
His name and cell number are on page one. He walks the job daily and he is the person who calls you with bad news.
If you cannot reach him within four business hours, call the owner's line — it is printed beside his.Five-year workmanship warranty
On top of the manufacturer warranty, which we register in your name and email to you when the job closes.
We schedule a written reinspection at year two and we call you to set it. You do not have to remember.
Other things we do
Siding by town
Siding questions
If yours isn't here, ask the chat in the corner or just call — the same person answers both.
How long does full-home siding take?
Can you side over the existing boards?
What if you find rot?
Will the new siding match my neighbor's or my HOA's requirements?
Book a walkaround
Forty minutes at your house, on a day that works for you. You get a fixed written price, a start date, and photographs of anything we find — whether you hire us or not.
