The Dovetail Method
Design, The Number, Build, The Walk-Through. Four phases, in that order, every time, with a signed change order any time the scope moves.

A dovetail joint holds because two parts are cut to fit each other exactly, in a specific order, before any glue goes on. We named the company after it because that is how we think a remodel should run: nothing forced together, nothing rushed, each step depending on the one before it. Below are the four phases, in the order they happen on every project we take on, whether it is a powder room refresh or a kitchen that moves three walls.
Phase one: Design
Nothing gets torn out until this phase is finished. Renee or one of our two designers measures the house with a laser measure rather than trusting the builder's original plans, which in a 1990s Ballantyne or Huntersville house rarely match what is actually framed. From there we draw the layout, usually with two or three options for a kitchen, build a 3D rendering so you are looking at your own space rather than a stock photo, and select every material — cabinet door style, countertop, tile, fixtures, hardware, paint — down to a level of detail that leaves nothing to be decided once a wall is open. Every selection goes into a physical binder with a sample or a swatch next to its name. You keep that binder.

Read more about what the Design phase includes in depth.
Phase two: The Number
Once design is locked, we price the entire job as one fixed number, plus a completion date, and we hold both for 60 days so you have time to decide without the price drifting. A contingency for what is behind the walls — old wiring, rot, a junction box someone painted over in 1987 — is already carried inside that number. If we find something ugly once a wall is open, it is reported to you with a photo, not billed as a change. The only thing that changes the price after this point is a change you make.
The change-order sheet
If you decide midway through Build that you want a different faucet, a wider island, or an extra outlet, that goes on a one-page change order: what changes, what it costs, and how many days it adds to the schedule. You sign it before the work happens, not after. No verbal changes, no surprise line item at the end. It is the same sheet whether the change is a 40 upgrade or a 4,000 one — the format does not change, only the numbers on it.
Phase three: Build
This is the longest phase and the one most homeowners dread, so we built the most structure around it. A single project manager, Marcus or Dee, runs your job from the first day of demo to the last punch-list item, and sends a text every afternoon: what happened today, what happens tomorrow, and a photo. You are not calling the office to find out whether the plumber showed up.
Dust walls and a daily broom
Zip-wall dust barriers go up before demo starts, sealing the work area from the rest of the house. Floor protection runs along the path from the work area to the door the crew uses, so a delivery does not track drywall dust across your living room. Every evening before the crew leaves, the site gets broom-clean — tools put away, surfaces wiped down, trash out. It is a small thing that changes how a four-to-twelve-week project actually feels to live through.

The temporary kitchen
For a kitchen project, we set up a temporary kitchen — a mini fridge, a microwave, and a utility sink, usually in a dining room or garage — before demo begins, not after you have gone two weeks without a working sink. It stays in place for the length of the Build phase and comes down the day your real kitchen is usable again.
The a daily promise
The completion date in The Number is not a hope. If we finish past that date for a reason that is Dovetail's fault, we pay you a daily credit for every day past it, and we show you the math: the original completion date, the actual completion date, the number of days between them, times a daily credit. A date can move without triggering the payment, but only for reasons that are documented and outside our control — a county inspection that gets rescheduled by the county, a documented weather delay, a client selection that arrived late, or a signed change order that added days on paper. Anything else, and the daily number is yours.
Phase four: The Walk-Through
Ninety days after your project is finished, we come back. Not because something broke, but because it is on the schedule the same way framing inspection is. A house settles, cabinet doors shift a sixteenth of an inch, caulk lines that looked perfect on day one show a hairline gap by day ninety. This is the phase built to catch that.
What the 90-day checklist covers
- Cabinet doors and drawers adjusted for square and smooth closing.
- Caulk lines re-run at tubs, showers, and countertop-to-backsplash joints.
- Grout checked for hairline cracks at movement joints.
- Faucets, drains, and any fixture with a reported drip or slow drain addressed.
- Touch-up paint at any nail pop or scuff from move-in.
- A walk of the full space with you, room by room, to note anything that has not come up yet.
The two-year workmanship warranty runs well past this visit, but the 90-day walk-through is where most of the small stuff that only shows up once you are living in a space actually gets found and fixed, on a date that was already on the calendar before your project ever started.
Where to start
If you want a sense of scope and cost before scheduling anything, start with the quiz for a Charlotte range. When you are ready to talk, the Design phase above is where every project, large or small, actually begins.
Questions about this
What happens if I want to change something after The Number is signed?
We write a one-page change order describing exactly what changes, what it costs, and how many days it adds to the schedule. You sign it before the work happens. It is the only thing that moves the fixed price after Design is finished.
How does the a daily promise actually get paid?
If we finish past the contract completion date for a reason that is our fault, we calculate the number of days late and pay a daily credit for each one, showing the original date, the actual date, and the math behind the total. Documented weather delays, late client selections, and signed change orders do not count against us.
Do I get a kitchen to use during construction?
For kitchen projects, yes. We set up a temporary kitchen with a mini fridge, a microwave, and a utility sink before demo starts, so you are not living without basic cooking and cleanup function for the entire length of the Build phase.
How long does the whole process take from first call to move-in?
Design runs 2 to 4 weeks, The Number about a week, and Build anywhere from 2 to 16 weeks depending on scope. A bathroom Refresh might be done in six or seven weeks total; a kitchen Reimagine that moves walls and plumbing can run several months.
Why do you wait 90 days for the final walk-through instead of doing it at move-in?
Cabinets settle, caulk shows its first hairline gaps, and doors shift slightly once a house has been lived in for a season. Ninety days gives those things time to show up, so the walk-through catches real issues instead of a still-new room with nothing to report.
An hour at your kitchen table.
A free design consult in your home. You leave with a plan, a timeline, and an honest opinion about what's worth doing. The number comes after the design, and it doesn't move.