
01
Paver patios and walkways
Layout, excavation, a compacted base and edge restraint before the first paver goes down. Patios, walkways and the steps that join them.
About paver patios and walkways→Landscape design, build and care
Design, build and care for the whole yard: the stone, the beds, the lawn, and the water that runs through all three.
Book a yard walk→or call (704) 555-0163
Sample photos. A client's own finished yards go here.



A yard works when the stone, the plants and the water are planned together, so that is how we plan them.

Before and after
Grade and drainage first, then the base, the walls and the stone. Planting goes in once the machines are gone.
Beds cut along the walk and the foundation, soil amended, shrubs spaced for the size they grow to.
Aerate, amend, seed or sod, then an irrigation schedule the grass can live with.
Sample pairs: stock photos stand in until the client's own before-and-after shots, taken from the same spot, are added.
Design, stone, planting, lawn and water, planned together so each part works with the others.

01
Layout, excavation, a compacted base and edge restraint before the first paver goes down. Patios, walkways and the steps that join them.
About paver patios and walkways→
02
Block or natural stone with gravel and drain pipe behind it, so the wall holds its grade and the water has somewhere to go.
About retaining walls and steps→
03
A plant list with mature sizes before anything is dug. Beds shaped, soil amended, plants set, mulched and watered in.
About planting and bed design→
04
Mowing, edging, seasonal feeding and weed control, on a schedule that follows the grass rather than the calendar.
About lawn care programs→
05
Strip, amend, grade away from the house, then lay. The ground gets shaped so water leaves the yard instead of sitting in it.
About sod and grading→
06
We trace where the water starts, not just where it pools, then regrade, run a french drain or build a dry creek.
About drainage and french drains→The seasonal calendar
Around Charlotte the planting season is fall and winter, the lawn wants its big day in September, and stone can go down almost any month the ground isn't frozen or soaked.

| Work | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Patios and walls | Design | Design | Build | Build | Build | Build | Build | Build | Build | Build | Build | Design |
| Trees and shrubs | Plant | Plant | Plant | Plant | Water | Water | Water | Water | Prep | Plant | Plant | Plant |
| Beds and perennials | Prune | Cut back | Mulch | Plant | Plant | Deadhead | Weed | Weed | Divide | Plant | Clean up | – |
| Lawn (fescue) | – | Pre-emergent | Pre-emergent | Mow | Mow | Mow high | Mow high | Mow high | Aerate, seed | Overseed | Leaves | – |
| Irrigation | – | – | Start-up | Check | Adjust | Adjust | Adjust | Adjust | Adjust | Adjust | Shut down | – |
| Lighting | Install | Install | Check | Install | Install | Install | Install | Install | Check | Install | Install | Install |
A typical year in the Charlotte area. Bold is the best window; the weather moves it.
How a design-build job goes

We walk the yard with you, note the light, the slope and where the water runs, then draw the plan.

Grading, drainage, walls and paving go in before anything is planted.

Beds shaped and amended, plants set at their mature spacing, then mulched and watered in.

A walk-through at the end, and a watering and care schedule for the first season.
They came out in the rain on purpose so they could see where the water actually went. Nobody else we called wanted to do that. Sample review.
Homeowner, Ballantyne

One company did the stone and the planting, so the patio and the beds actually fit together. Sample review.
Steele Creek Patio and beds

The side yard had been soggy for years. They regraded it and ran a drain to daylight, and it has stayed dry through the storms since. Sample review.
Fort Mill, SC Drainage and front beds

We got a plant list with mature sizes before anything was dug, which made the choices easy. Sample review.
Tega Cay, SC Shade planting

They explained why the wall needed gravel and pipe behind it instead of just block. Our old wall didn't have it, and it leaned. Sample review.
Belmont Retaining wall
The shop is on Steele Creek Rd, so Steele Creek and Ballantyne are close by. Fort Mill and Tega Cay are over the South Carolina line, with their own permits and inspectors, and we handle that paperwork. Belmont and Mount Holly are across the Catawba on I-85.
Red clay, HOA review boards and sloped lake lots come with this part of the county, and the plan accounts for all three.
Steele CreekBallantyneFort Mill, SCTega Cay, SCBelmontMount Holly


Because a yard nobody has walked is a guess, and a guess on a website is either bait or wrong. Two patios the same size can differ by a lot depending on grade, access for a machine, and whether the base has to be dug deeper for clay. After the walk you get a written proposal with the whole scope in it. The how pricing works page lists what actually drives the number.
Yes. The patio, the walls, the beds and the irrigation are drawn on one plan and built in the right order, so the grade works, the lighting wire goes in before the stone, and the plants end up where the light is.
It has to be. Charlotte red clay drains slowly and most newer lots were graded for the builder's convenience, not yours. We look at where the water starts, which is usually downspouts, a neighbor's slope, or a swale that got filled in. The fix is regrading, a french drain, a dry creek, or all three, and it happens before any stone is laid.
We prepare the submittal: the drawing, the material spec and the plant list, in whatever format the association wants. Most Ballantyne and Fort Mill neighborhoods want all three before anything moves. We wait for written approval before scheduling the crew, because tearing out an unapproved wall is a bad day for everyone.
Call and we'll come look. Most first-year losses come down to water or a hard freeze, so we check the irrigation and the spot before talking about a replacement. What your job includes is written into the proposal.

Book a yard walk
Name and number are enough to start. Luis will call to set up a time to walk the property with you.
Or call (704) 555-0163 · Mon-Fri 7:30am-5pm · Sat by appointment